In this warehouse with the size of two football fields, OPTIMAL Engineering designed and implemented technical systems including cooling installation maintaining a constant temperature for food products. The cooling system performance exceeds 1 MW.


| Project Details |
| Investor / Client: FM Logistic |
| Completion Date: 2011 |
| Site: FM Logistic Tuchoměřice, Czech Republic |
| Service: Design / Construction |
| GFA (m2): 16.900 m2 |

